|
|
Thorntonbank WTTI, Belgium |
|
Transport and installation of 6 5MW offshore Wind Turbine Generators.
|
|
|
Installation of 1422 mm piles for aggregates jetty.
Pile drilling for rock loading facility.
Jetty construction.
|
|
Installation of a floating jetty. Pile drilling for rock loading facility.
|
|
Alpha Ventus Wind Farm, Germany |
|
Wind Turbine Generator Installation.
|
|
Limbe Sonara Wharf, Cameroon |
|
Drilling and installation of 5 dolphin piles. Installation of jetty structure and furniture.
|
|
Installation of 1200mm piles for access jetty and iron ore wharf and 1600mm piles for berthing dolphins.
|
|
|
|
|
|
|
Page 1 of 3 |